Reactive Blockage Clearance

The Problem

Blockages reported to toilet and kitchen sink pipe work.

The Course Of Action Engineers attended site to investigate and clear the blockages.

Work Undertaken Sink: small bore electro-mechanical machine works carried out to clear waste pipework from sink to external waste gully. Toilet: Medium bore electro-mechanical machine was used from the toilet pan downstream to the manhole connection.

The Outcome Blockages were all cleared and the system restored to 100% working operation.

Job Length 2 days

Products Used

  • External Waste Pipe
  • External Waste Gully
  • Small Bore Electro-Mechanical Machine

Gallery