Reactive Blockage Clearance Case Study
Blockages reported to toilet and kitchen sink pipe work.
The Course Of ActionEngineers attended site to investigate and clear the blockages.
Work UndertakenSink: small bore electro-mechanical machine works carried out to clear waste pipework from sink to external waste gully. Toilet: Medium bore electro-mechanical machine was used from the toilet pan downstream to the manhole connection.
The OutcomeBlockages were all cleared and the system restored to 100% working operation.