After attending the site to investigate dripping from the ceiling on the shop floor, we located a defective cast iron section of drainage serving the restaurant above.

All equipment and materials were sourced after a temporary repair was carried out. Our engineers attended the site out of hours for the convenience of the client and accessed the pipe work via mobile tower. The defective section was removed and replaced with new 100mm UPVC pipework. This ensured the shop was able to reopen the following day and normal service was resumed with minimal disruption.

  • Our prices can be up to 30% lower than our Central London competitors
  • Latest equipment and highly experienced engineers
  • Open 24 hours a day, 7 days a week
Fast response times

Guaranteed on site within two hours

Problems with your drains?

Get in touch with our team today

Areas We Cover

We have engineers covering London, Central London and the Home Counties

Top

By clicking "Accept All Cookies", you agree to the storing of cookies on your device to enhance site navigation, analyse site usage, assist in our marketing efforts, and for personalised advertising.

More Information Accept All Cookies